AE Crankshaft repair

PROJECT: AE Crankshaft repair
LOCATION: GREECE
CLIENT: MSC Shipmanagement Ltd – Vessel MSC SHAULA
DURATION OF REPAIRS: 5 Days

Vessel MSC SHUALA suffered A/E crankshaft main and crankpin journals damaged after a connecting rod failure. The crankshaft was send to our facilities for damage assessment and salvaging. The works included the following stages:

  • Rigorous inspection, measurements and damage assessment
  • Rough grinding of all main and connecting rod journals on our CNC DB7000 grinder with PIN CHASING technology
  • Buildup of all journals
  • Stress relieving
  • Final grinding of all journals to standard dimensions with maximum ovality 3μm