top of page
AE Crankshaft repair
PROJECT:
AE Crankshaft repair
LOCATION:
GREECE
CLIENT:MSC Shipmanagement Ltd – Vessel MSC SHAULA
DURATION OF REPAIRS:
5 Days




Vessel MSC SHUALA suffered A/E crankshaft main and crankpin journals damaged after a connecting rod failure. The crankshaft was send to our facilities for damage assessment and salvaging. The works included the following stages:
-
Rigorous inspection, measurements and damage assessment
-
Rough grinding of all main and connecting rod journals on our CNC DB7000 grinder with PIN CHASING technology
-
Buildup of all journals
-
Stress relieving
-
Final grinding of all journals to standard dimensions with maximum ovality 3μm

bottom of page